Project Planet – Earth vs Humanity

Project Planet - Earth vs Humanity Free Download

TORRENT – FREE DOWNLOAD – CRACKED

Project Planet – Earth vs Humanity – Destroy Humanity with virus outbreaks, asteroid impacts and more as Planet Earth! Or team up with up to five friends as the World Leaders,…


GAME OVERVIEW


 

Destroy Humanity with virus outbreaks, asteroid impacts and more as Planet Earth! Or team up with up to five friends as the World Leaders, Industry, Media, Scientists and Public, and try to survive. Impossible dilemmas and branching narratives create countless paths in this strategic party game! As Planet Earth, your goal is to destroy humanity to ensure your own survival. You can trigger disasters and all kinds of events to damage the Ecosystems & Pollution and turn the planet into an unliveable hell! Earth’s arsenal is based on real-life threats, ranging from virus…

 

info Title: Project Planet – Earth vs Humanity

developer Developer: Fifth Harbour Studios

developer Publisher: Fifth Harbour Studios

release date Release Date: 25 Sep, 2023

genre Genre: Survival, Strategy

 


DOWNLOAD LINKS


 

release name Release Name: Project Planet Earth vs Humanity

cracked by Cracked by: P2P

size Release Size: 960.30 MB

 

magnet TORRENT LINK

Project.Planet..Earth.vs.Humanity.Torrent

 


SYSTEM REQUIREMENT


Minimum:

  • OS: Windows 7
  • Processor: 2.66 Ghz Core 2 Duo or Greater
  • Memory: 4 GB RAM
  • Graphics: Integrated Graphics
  • DirectX: Version 11
  • Network: Broadband Internet connection
  • Storage: 3 GB available space

Recommended:

  • OS: Windows 10 or later
  • Processor: 2.33 GHz Quad Core or Greater
  • Memory: 8 GB RAM
  • Graphics: Discrete Graphics Card
  • DirectX: Version 11
  • Network: Broadband Internet connection
  • Storage: 3 GB available space

SCREENSHOTS


Project Planet - Earth vs Humanity Torrent Download

Project Planet - Earth vs Humanity PC Crack